
Ray Holman and Peter Warren ( and Dave Cotton last week ) have been up on the morning or the 24th of March 2015, continuing the concreting of the lower sections of the steel frame , making ready for blocks to be layed and the floor to be layed in the very near future , once this is done you all should be able to see real progress being made , remember that this is all done through volunteers aiming to give the village a fantastic new pavilion.