Progress report on the Pavilion

After lots of work over the past 18 months below ground including the ground-source heat pump pipework, drainage and services things are now progressing above ground. We have started to set out the beams in the block and beam floor, in preparation to lay the blocks.

Hopefully over the coming months we will be able to get the blocks down and get the final services into the building. We will then be looking to get the walls up and roof on in preparation to make things wind and water tight. Once we have achieved this it will be full steam ahead with the rest of the build.

As things are now progressing we will be giving more regular updates on hear and via our Facebook page https://www.facebook.com/beningtonrec/